Hamdan Bin Mohammed Bin Rashid Sports Complex

Hamdan Bin Mohammed Bin Rashid Sports Complex 5 min
Hamdan Bin Mohammed Bin Rashid Sports Complex 1
Hamdan Bin Mohammed Bin Rashid Sports Complex 2
Hamdan Bin Mohammed Bin Rashid Sports Complex 3
Hamdan Bin Mohammed Bin Rashid Sports Complex 4

Project Location:

Dubai Land

Project Objective:

Establishment of a huge sports complex, its length is 200 meters, a width of 120 meters and height of 33 meters The capacity of 15,000 spectators and is unique being closed athlete building with air conditioning and is considered an environmentally friendly building. The project included a range of new technologies that rarely meet in one project. Starting from the structure and diversify uses of controlled mechanically in the dimensions of swimming pools in length and depth. In addition of that, the unique cover that covers those pools for non-water sports, moreover, the new lighting techniques and uniqueness in the displaying and facilities radio and television and control technology in temperature and humidity different in one space. and ending with those have contributed as much as unprecedented in the saving of energy and water, which achieve savings in energy consumption of 7.94 MW / h which is 68% compared to the traditional system, in addition to protecting environment of CO2 gas emissions by 5.2 tons / hour in the water, realizing a savings of 377.4 cubic meters / day.

Project Elements:

Main Building: (four floors) includes the main hall and includes 15,000 seats for spectators, and three swimming pools for swimming competitions, diving, and training provided with mobile floor for various training purposes. Also there is a VIP entrance, public entrance, Fina offices, businessmen compartments hospitality areas, cafeteria, media center, as well as services allocated to each floor. Energy Center consists of pumps rooms, water tanks and filtration systems, electromechanical equipment and chillers. General site work and infrastructure and landscape work.

End User:

Dubai Sports Council

Built-up area:

49,000 square meter

Project Completion Date:

2010

Developed by edirect

FILTER BY :

Search Suggestions :

  • Start searching to see suggestions

Results For "Testing"

0 Results found

Enter a search term above to see results

preview image
per page
Happiness Meter