Press Enter to jump to Navigation menu Press Enter to jump to main content
عربي
There is currently no translation available for this content. Please check again laterHome

Cold Stores

Project Location:

Al Awir​

Project Objective:

A distinguished project shall be the first type to be done in middle east to erect multi story cold stores for fruits & vegetables in Dubai, the total storage capacity of the project is 20500 ton with an average of 360 ton for each store.

Project Elements:

The project consists of (G+Mezzanin+3 typical floors) building contains (56) stores with an average area of 500 sq m each connected vertically through 6 no’s of industrial lifts (6m*5m) in addition to two numbers of loading & unloading areas of 15 m width with trucks/cars parking of 64 numbers. General site work and infrastructure work, landscape work.

End User:

Dubai Municipality

Built-up area:

447,476 Square Meters​

Project Completion Date:

2016

Cold Stores - المستودعات المبردة
Cold Stores - المستودعات المبردة
Cold Stores - المستودعات المبردة